Before that, Mercom reported another wind tender floated by SECI for 1.8 GW of projects was left undersubscribed with bids totaling 551 MW only. According to SECI, it has already allocated 9,600 MW of wind energy projects in the first seven tranches of the scheme. Now, the clause is amended to say that, the parties agree that decisions about the approval and adoption of the tariff along with SECI’s trading margin for procurement of contracted capacity, will be binding on all parties concerned, as contained in the Electricity Act, 2003 or any amendments. A SECI official confirmed to Mercom, “The wind tranche-IX 2 GW is a retender of the earlier announced 1.2 GW wind tender.” However, the retender has undergone a capacity increase at 2 GW.
In August, SECI awarded 439.8 MW of wind projects in its auction. © 2020 by Mercom Capital Group, LLC.
In September 2019, SECI had invited bids from wind power developers to develop 1,200 MW of interstate transmission system (ISTS) connected wind power projects under Tranche IX of the ISTS program. With ongoing China border issues, it is likely that 20% of BCD will be applicable now on imported solar modules instead of earlier expected staggered implementation of BCD starting from 10% in initial years to gradually to 20%. October 1, 2020 The projects are to be delivered on a build-own-operate (BOO) basis. It was part of the tender floated by the agency for 1,800 MW of ISTS-connected wind projects under Tranche VIII. However, for projects where auctions are already completed before the notification of BCD, these projects will be protected under the ‘grandfathering’ clause. SECI has also added two new clauses to this tender, Government Extends Timeline for Localization of EV Components, Volkswagen to Invest €15 Billion in Electric Mobility by 2024 in China, Uttarakhand DISCOM Mulls Passing on Tariff Rebates to Power Consumers, SJVN Bags a 100 MW Project in Gujarat’s Raghanesda Solar Park, NHPC Signs Power Sale Agreements for 1.7 GW of Solar Projects, Electricity Regulator Rules in Favor of Open Access Solar Project Developer, Daily News Wrap-Up: Siemens and WUN H2 to Build a CO2 Free Hydrogen Production Facility, Andhra Pradesh Government Allots Over 1,454 Acres of Land to Set up Solar Projects, Women Occupy One-Third of Workforce in the Global Renewable Energy Sector, Power Sector Financier REC Ltd to Increase its Borrowing Limit to ₹4.5 Trillion. nit documents : comprehensive it facility management services including 03 (three) onsite technical service personnel for a period of 02 (two) years at corporate office complex of solar energy corporation of india limited (seci), new delhi (function($) {window.fnames = new Array(); window.ftypes = new Array();fnames[0]='EMAIL';ftypes[0]='email';fnames[1]='FNAME';ftypes[1]='text';fnames[2]='LNAME';ftypes[2]='text';fnames[3]='ADDRESS';ftypes[3]='address';fnames[4]='PHONE';ftypes[4]='phone';fnames[5]='BIRTHDAY';ftypes[5]='birthday';}(jQuery));var $mcj = jQuery.noConflict(true); JMK Research & Analytics is a boutique consultancy firm providing research and advisory services to Indian and International clients across three key focus areas – Renewables, Electric mobility and Battery storage market. This is the first major tender by SECI where bid submission is conducted after almost a gap of four months due to COVID-19. The tender received bids of total 4,350 MW solar capacity from 12 project developers. October 1, 2020, Official Website - Solar Energy Corporation of India ltd. Design & Developed by In this tender, some new names can be seen which were not active in the last few solar tenders like SolarPack and ENEL. Vena Energy and JSW Solar have won 970 MW of blended wind projects under the Solar Energy Corporation of India’s 2.5 GW auction for interstate-connected (ISTS) blended wind power projects (Tranche IX).According to Mercom’s sources, Vena Energy Vidhyuth Private Limited won 160 MW of projects quoting the lowest tariff of ₹2.99 (~$0.0401)/kWh, while JSW Solar was awarded 810 MW of …
Together, the two bidders were allotted 439.8 MW of wind projects.
Reverse auction for this tender is expected by next week. seci/sd/eoi/20-21 Expression of Interest (EOI) for Renewable Energy (RE) based Solutions/ System/ Technology for meeting energy requirements in remote areas … Apart from this 2 GW tender, additionally there are about 18.2 GW of SECI tenders where bid submission date is before July 31, 2020. All Rights Reserved. Your email address will not be published. SECI floated this tender in the month of March 2020. Moreover, SECI has mentioned that the debt due on or after the COD cannot exceed 80% of the total project cost. Figure 1: Tentative list of bidders for SECI, 2,000 MW, Solar, ISTS, Tranche-IX tender. But, due to COVID lockdown, its bid submission deadline got extended till June 22, 2020. : Overwhelming response to SECI, 2 GW, ISTS (Tranche-IX) solar tender Solar Energy Corporation of India’s (SECI) tender for 2 GW of Interstate Transmission System (ISTS) connected Solar PV Project under tranche IX has received an overwhelming response from the project developers resulting into an over-subscription by about 2.35 GW. (TRANCHE-IX) RfS No. Required fields are marked *. Prior to joining Mercom, he worked in many roles as a business correspondent, assistant editor, senior content writer, and sub-editor with bcfocus.com, CIOReview/Silicon India, Verbinden Communication, and Bangalore Bias. Save my name, email, and website in this browser for the next time I comment. SECI latest auction saw the record low bid of ₹2.36 (~$0.0313)/kWh. The SECI has amended a clause in both the power purchase agreement (PPA) and a power sale agreement (PSA). Ltd. First World Solar Technology Summit (WSTS) on 8 September 20 organised by ISA, PRE-BID MEETING NOTIFICATION : COMPREHENSIVE IT FACILITY MANAGEMENT SERVICES INCLUDING 03 (THREE) ONSITE TECHNICAL SERVICE PERSONNEL FOR A PERIOD OF 02 (TWO) YEARS AT CORPORATE OFFICE COMPLEX OF SOLAR ENERGY CORPORATION OF INDIA LIMITED (SECI), NEW D, Pre-Bid Queries Format: Tender for 100 MW (AC) Solar PV Project (200MWp DC capacity) along with 50MW/150 MWh Battery Energy Storage System at Rajnandgaon, Chhattisgarh, India, Expression of Interest (EOI) for Renewable Energy (RE) based Solutions/ System/ Technology for meeting energy requirements in remote areas (HAA) of Himalayas, India, NIT DOCUMENTS : COMPREHENSIVE IT FACILITY MANAGEMENT SERVICES INCLUDING 03 (THREE) ONSITE TECHNICAL SERVICE PERSONNEL FOR A PERIOD OF 02 (TWO) YEARS AT CORPORATE OFFICE COMPLEX OF SOLAR ENERGY CORPORATION OF INDIA LIMITED (SECI), NEW DELHI, Pre-Bid meeting notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Solar PV Project (200MWp DC capacity) along with 50MW/150 MWh BESS at Rajnandgaon, Chhattisgarh. SECI/C&P/WPD/1200MW /T9 RfS/092019 Dated: 20.09.2019 ISSUED BY Solar Energy Corporation of India Ltd 1st Floor, D-3, A-Wing, District Centre, Prius Platinum Building, Saket, New Delhi-110017 Tel No. More articles from Rakesh Ranjan. The Solar Energy Corporation of India has extended the deadline for the submission of bids for its 1,200 MW wind tender.The new bid submission deadline for the tender is December 5, 2019. According to the Ministry of New and Renewable Energy (MNRE), wind power accounted for 36.9 GW of the total installed power capacity and nearly 10.09% of the overall power capacity mix as of September 2019.
Solar Energy Corporation of India’s (SECI) tender for 2 GW of Interstate Transmission System (ISTS) connected Solar PV Project under tranche IX has received an overwhelming response from the project developers resulting into an over-subscription by about 2.35 GW. July 2020 is a critical month for solar project developers as new form of duties in form of Basic Custom Duties (of upto 20%) are likely to be notified before the lapse of safeguard duty (15%) by July 31, 2020.